WST 1

CONSTRUCTION SITE WASTE MANAGEMENT

AIM: TO PROMOTE RESOURCE EFFICIENCY VIA THE EFFECTIVE AND APPROPRIATE MANAGEMENT OF CONSTRUCTION SITE WASTE.

The Clestra Hauserman demountable wall system consists of modular panels that are manufactured in our factory and arrive on the jobsite ready to install. So there is no waste, no painting, no plaster and no mess.

Installation times are particularly short, thanks to the monoblock panel system. Construction time is thus shortened, with a consequent reduction in the environmental impact.

Waste caused on the site itself is thus minimal, being almost solely due to packaging that consists of wood and cardboard which are both 100% recyclable. Handling of this waste is thus easy and will adapt to the site-specific procedures or, in the absence of such procedures, be handled directly by Clestra Hauserman.

This criterion is completed through the waste quantities reduced to the minimum. To reach the 3 credits available the amount of waste generated per 100m² of gross internal floor area has to be inferior of 4.7 tonnes. Clestra Hauserman products represent less than 3% of this amount.